Go to Milbury Systems Contact us

  • Home
  • Room Solutions
    • Overview
    • FAQ
    • Ten out of Ten
  • Stadia Solutions
  • Retaining Solutions
    • L Walls
    • L & T Walls
    • Rocket Walls
    • Ground Beams
    • FAQs
  • Sectors
    • Hotels
      • Hampton by Hilton
      • Newcastle International Airport Hotel
      • Radisson Blu Hotel
      • Express by Holiday Inn
    • Student Accommodation
      • University of Essex
      • University of Reading
      • University of London - Mile End Road
      • Mason Hall, University of Birmingham
      • Hughenden Park Student Village, High Wycombe
      • University of Abertay
    • Stadiums
      • New Ricoh Arena - Coventry
      • Brit Oval - Kennington
      • Preston North End Football Stadium
      • Olympics Aquatics Centre
    • Retaining
      • Sewage Treatment Works - Minworth
      • Civic Amenity Site - Oadby
  • CPDs
    • CPD Roadshows
  • Our Commitment
    • Sustainability
    • Environmental Policy
    • Health & Safety Policy
  • News
  • About Us
    • About Eleco plc
    • Our Journey
  • Contact Us
Stadia Solutions

Stadia SolutionsQuick and safe seating solutions

Precast Concrete Stadium Terracing

Bell & Webster's design and manufacturing expertise ensures a cost effective solution to complicated terrace configurations. 

Precast concrete stadium terraces are designed for safe and fast erection. StadiaSolutions units provide a versatile economic solution for varying viewing standards, imposed loading and seating arrangements. Since our first project, a stand at Villa Park for Aston Villa Football Club; we have continued to provide terracing for numerous other sporting disciplines including Horse Racing, Cricket, Athletics, Rugby Union and League, Tennis and Football. Our most recent terracing project was the Olympic Aquatic Centre. Outside of the sporting sector, we have supplied terracing components for multi-screen cinemas, theatres, auditoriums, conference centres and arenas.

Differing design and manufacturing concepts are needed to accommodate such variations. On going investment programmes continue to enable existing moulds to be more easily adapted to meet the demands of the new Stadia requirements or redevelopment projects.

Bell & Webster Concrete Limited design and manufacture precast concrete terrace and step units for sports Stadia, indoor Arenas and Multi-screen cinemas.

The innovative design has proven to be cost effective and product development has reduced the component weight and erection time to a minimum.

Steel moulds used by Bell & Webster can be modified to produce standing terraces with 380mm tread, a rise of up to 200mm and spans of up to 11,000mm. Further moulds have been added to the range to allow the design and manufacture of units with treads of up to 960mm for Stadia projects and up to 1,500mm for indoor arenas and cinemas.

Sizes
Maximum span 11,000mm


Variable tread up to 1,500mm


Variable riser up to 200mm

More Safe precast concrete building solutions
Improved safety through controlled off site factory engineered manufacturing and experienced installation.

 

Faster precast concrete building solutions
Precision design, engineering and project management resulting in highly efficient manufacturing, delivery and installation to enhance your programme while reducing safety risks.

 

More Value
Controlled off site manufacturing provides more value with less on site requirements such as waste disposal, site deliveries and scaffolding.

 

More Flexible
StadiaSolutions cater to all designs allowing for total flexibility while maintaining a robust high quality finish.

 

More Secure
Our factory engineering provides a safe and secure Stadium Terracing Solution in demanding environments.

 

More Green
Our manufacturing process not only recycles water and concrete but provides a consistent product resulting in very little waste. We source aggregate and mix from trusted sustainable partners.

 

Robust
Quality factory engineering results in a solution that is future proof with reduced maintenance and repair costs over the life of the building.

 

Predictable
Project management to meet programmes on time with budget and quality guaranteed.

 

Healthier
Fewer operatives on site, resulting improved site management and reduced health & safety risks.

 

CONSISTENT QUALITY
Off site manufacturing provides consistent product quality with less environmental influences allowing our StadiaSolutions to stand the test of time.

Stadia Case Studies

  • New Ricoh Arena - Coventry
  • Brit Oval - Kennington
  • Preston North End Football Stadium
  • Olympics Aquatics Centre - Stratford

Quick Enquiry

 
 
 


 
 
  
Captcha :: Enter the letters
 

 

Powered By ChronoForms - ChronoEngine.com
Stadia Solutions
Stadia Solutions
Home
About Us
Our Commitment
News and Events
Contact Us
Room Solutions
Stadia Solutions
Retaining Solutions
CPDs
Text Size
Terms & Conditions
Privacy Statement
Like us on Facebook Follow us on Twitter


© Bell & Webster 2011 | Last updated: March 2013