Go to Milbury Systems Contact us

  • Home
  • Room Solutions
    • Overview
    • FAQ
    • Ten out of Ten
  • Stadia Solutions
  • Retaining Solutions
    • L Walls
    • L & T Walls
    • Rocket Walls
    • Ground Beams
    • FAQs
  • Sectors
    • Hotels
      • Hampton by Hilton
      • Newcastle International Airport Hotel
      • Radisson Blu Hotel
      • Express by Holiday Inn
    • Student Accommodation
      • University of Essex
      • University of Reading
      • University of London - Mile End Road
      • Mason Hall, University of Birmingham
      • Hughenden Park Student Village, High Wycombe
      • University of Abertay
    • Stadiums
      • New Ricoh Arena - Coventry
      • Brit Oval - Kennington
      • Preston North End Football Stadium
      • Olympics Aquatics Centre
    • Retaining
      • Sewage Treatment Works - Minworth
      • Civic Amenity Site - Oadby
  • CPDs
    • CPD Roadshows
  • Our Commitment
    • Sustainability
    • Environmental Policy
    • Health & Safety Policy
  • News
  • About Us
    • About Eleco plc
    • Our Journey
  • Contact Us
Retaining Solutions Ground Beams
Ground Beams

Ground Beams

Bell & Webster manufacture precast concrete beams in a variety of designs and dimensions as specified by the client.

Handling and Installation:

  • Beams are delivered and off loaded using the quick release lifting loops attached to the recessed eyes.
  • The beams are then lifted into their final position using the same method

Design Beams are designed to BS 8110 the structural use of concrete
Loading Equivalent to 2.5 metres high cavity brickwork
Section 200mm minimum width x upto 2000mm high, rectangular or with nib for brickwork
Lengths 4500mm, 6000mm, 7500mm and specials
Bearings Minimum end bearing 300mm
Anchor Dowels T.32 - Hole diameter 75mm
Lifting Proprietary recessed lifting eyes
Concrete mix Minimum compressive strength 40N/mm2@ 28 days
Cement Ordinary Portland
Aggregate Trent Valley 20mm max size
Reinforcement

Characteristic strengths, main bars 460N/mm2, links 250N/mm2,
minimum cover 40mm

Retaining Solutions

  • Retaining Solutions
  • L & T Walls
  • Rocket Walls
  • Ground Beams
  • FAQs

Quick Enquiry

 
 
 


 
 
  
Captcha :: Enter the letters
 

 

Powered By ChronoForms - ChronoEngine.com
Home
About Us
Our Commitment
News and Events
Contact Us
Room Solutions
Stadia Solutions
Retaining Solutions
CPDs
Text Size
Terms & Conditions
Privacy Statement
Like us on Facebook Follow us on Twitter


© Bell & Webster 2011 | Last updated: March 2013